skip to Main Content
Case Study Phase Eight

Case Study: Phase Eight

The Challenge Simply Solutions were asked to attend the Edinburgh George street location of Phase Eight to evaluate a damaged roof. Upon inspection, the roof was deemed to be in very poor condition and required urgent repairs to prevent stock…

Read More
Case Study Clares Stores

Case Study: Claire’s Stores

The challenge Due to a site relocation at Glasgow Central Station, Simply Solutions were requested to attend site to de-brand the store including removing external signage, slat wall, air conditioning, tills and IT equipment within a period of 24 hours…

Read More
Back To Top