
Case Study: Phase Eight
The Challenge
Simply Solutions were asked to attend the Edinburgh George street location of Phase Eight to evaluate a damaged roof. Upon inspection, the roof was deemed to be in very poor condition and required urgent repairs to prevent stock damage.
Through a Schedule of Works External and Internal, The Simply Solutions’ tool ten working days from inception to completion.